ARRA

American Recovery and Reinvestment Act in District 4



Missouri was the first state in the nation to begin construction on highway projects funded by the American Recovery and Reinvestment Act. The department has obligated all of the $524.6 million it received in American Recovery and Reinvestment Act funds for MoDOT administered projects, meeting the required deadline a month ahead of schedule.  The Missouri Highways and Transportation Commission has awarded 187 economic stimulus projects totaling $469 million. The ARRA funding awarded to date will support 12,524 direct, indirect and induced jobs based on Federal Highway Administration estimates. 

   

Route:

Route 2 – Thin lift overlay from Commercial St. to Route ZZ.

Cost: $822,000

Status:

PROJECT COMPLETE.
Map:
   
   

Route:

Route 169 – Sidewalk improvements from Route 92 to Route KK.

Cost:

$1,500,000

Status:

PROJECT COMPLETE.

Map:
 
   

Route:

Route 69 – Thin lift overlay from the Clinton County line to Route 92. Total length of project is 5.977 miles.

Cost: $338,000

Status:

PROJECT COMPLETE.

Map:
 
 

Route:

Route 9 – Rehabilitate Heart of America Bridge bridge structure over the Missouri River, including addition of a bicycle and pedestrian facility.

Cost: $4,545,000 (Balance of project being funded by other sources; total project costs are $7.1 million.)

Status:

PROJECT COMPLETE.
Map:
 
 

Route:

Route 1 – Sidewalk improvements from Vivion Road to 72nd Street.

Cost: $1,500,000

Status:

PROJECT COMPLETE.

Map:

 

Route:

Route 52 Thin lift overlay from the St. Clair County line to Route 13.

Cost:

$850,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location

 

Route:

Route 150 – Widen from two lanes to four lanes from Horridge Road to Route 291.

Cost: $17,226,000 estimate

Status:

PROJECT IS UNDER CONSTRUCTION AND ON SCHDULE. A $14,101,938 contract (Significant Savings!) was awarded Aug. 5 to Emery Sapp & Sons Inc.of Columbia, Mo.
Map:
 
 

Route:

Route I-70 and 435 Interchange – Construct new half diamond interchange at Route 40/I-435, replace Blue Ridge Cut-off bridge over I-70, add lanes to I-70 and modify some ramps.

Cost: $39,337,177

Status:

PROJECT IS UNDER CONSTRUCTION AND ON SCHDULE. Contract awarded to Clarkson Construction Co.
Map:
Review the Web site for complete details.
 
 

Route:

Route 50Complete diamond interchange at Bynum Rd.

Cost: $5,920,000 (Balance of project being funded by other sources; total project costs are $7.4 million)

Status:

PROJECT IS COMPLETE.

Map:
 
 

Route:

I-70 – Rehabilitate eastbound bridges from Troost to Route 40.

Cost: $$6,673,349

Status:

PROJECT COMPLETE

Map:

Route:

Route 131Pavement improvements and resurfacing from Route 50 to Route 2.

Cost:

$1,209,710

Status:

PROJECT COMPLETE. The contract was awarded to Hilty Quarries Inc. work inlcuded paving, shoulder work and striping with the addition of rumble stipes to enhance safety along this route.

Map:  Review the Google Map of this location

Route:

Route 70 – Pavement improvements on the eastbound and westbound lanes from the Jackson County line to Odessa.

Cost:

$7,000,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route FFThin lift overlay from Gillespie Drive to Route O. Total length of project is 12.287 miles.

Cost:

$694,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location

Route:

Interstate 29 – Resurface pavement and shoulders on northbound and southbound lanes at various locations from Route 273 to Vivion Road 

Cost:

$11,799,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route 45Thin lift overlay from Route 273 to Spur 45 south.

Cost:

$667,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route 273 – Pavement improvements on Route 273 from Route JJ to I-29 and Spur 92 from Route 273 to Route 92.

Cost:

$1,170,000

Status:

PROJECT COMPLETE. Project was awarded to Ideker, Inc. Work began along Route 273 in early October. All work was complete on November 15.

Map: Review the google map of the location
   
   

Route:

Route 9Replace bridge over White Aloe Branch, south of Route FF

Bridge:

ARRA providing $105,000; $599,000 funded by other source

Status:

PROJECT COMPLETE

Map: Review the google map of the location

Route:

Route CThin overlay from Route U to Route 10. Total length of project is 5.117 miles.

Bridge:

$289,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route MThin lift overlay from Route C to Route 10. Total length of project is 5.763 miles.

Bridge:

$323,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   
   
   