The Route 45 Location Study is scheduled to be completed in 2006. Here are some of the study's key events:
Spring 2006
Conduct initial research and analysis of corridor needs.
May 25, 2006
Public meeting to examine existing corridor conditions.
Early Summer, 2006
Develop and evaluate potential alternatives
Late Summer, 2006
Determine potential alignment of roadway.
Fall 2006
Prepare environmental documentation.
September 7, 2006
Public meeting to examine reasonable alternatives.
December 2006
Study recommendations approved.
January 2007
Project design begins.
Winter 2008
Design public hearing.
Summer 2010
Construction begins.