News and Information News and Information contact, jobs, news, sitemap
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

Missouri Highways and Transportation Commission
Project Bid Opening Info
Contact Us
Map Request
MoDOT Express Lane
MoDOT
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888 ASK MODOT
(1-888 275 6636)
MoDOT News Release
August 19, 2005 

Hollister/U.S. 65 Interchange Construction
Update for Week of August 22

Traffic Alert!
* U.S. 65 closed at night for 15 to 45 minutes between 10 p.m. and 6 a.m. Monday through Thursday nights. Bridge girders being installed for new Business 65 overpass.

Work scheduled:
* Rock blasted two to three times each day along U.S. 65 near Gage Drive in area of interchange construction
* Concrete poured for curb and gutter and traffic signal bases near Industrial Boulevard and Birch Road
* Drain pipe installation and dirt grading and hauling along Route V near College of the Ozarks
* Construction of new Business 65 overpass bridge

Impact on Traffic:
* U.S. 65 traffic stopped about 5 minutes at a time for blasting near roadway
* Two-way traffic on U.S. 65 shifted to temporary bypass (new northbound lanes) east of existing lanes
* Heavy equipment near roadway and trucks entering/leaving construction areas on Route V and Gage Drive west of U.S. 65
* Occasional one-lane traffic on Industrial Boulevard and Birch Road
Most work taking place AWAY from traffic

Note: Large trucks and other vehicles towing trailers should use Birch Road to access shopping center because turning radius at Mall Road is tighter

Work zone speed limit on U.S. 65 Temporary Bypass: 35 mph.

Project background:
* Construction of U.S. 65/Business 65 interchange and separate overpass bridge for Business 65 north of new interchange
* Widening of U.S. 65 to four lanes along 1.6 miles (2,000 feet north of Bus. 65/Route V to just south of Route 165)
* Cost: $19.2 million (low bid), shared by MoDOT, City of Hollister and Taney County
* Prime contractor: W.A. Ellis Construction of Independence
* Scheduled completion: Fall 2006

(For more information, call MoDOT in Springfield at 417-895-7600 or toll-free at 1-888-ASK-MoDOT.)

 

   
   
CONTACT CONTACT CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP