All work subject to change due to weather or priority adjustments. Motorists are urged to exercise caution while passing through work zones. Workers may be on or near the roadway. Signs will be posted and flag persons will be present in areas where traffic will be impacted. Please contact the MoDOT Customer Service Center by calling the toll-free number 1.888.ASK.MoDOT (275.6636).

Receive FREE email updates

PDF File: Week of May 12

Interstate 44:

Route Interstate 44: MoDOT crews will mow the right-of-way. This function controls roadside vegetation and improves sight distance.
Route Interstate 44: MoDOT crews will perform milling on the roadway. Milling removes excess material from cracks and joints.

Return to top

Carter County

Construction Project

Route 60: Contractor crews have begun constructing drain structures and clearing in preparation for grading and paving. Work continues as the contractor constructs culverts in various locations throughout the project.

Location: 0.3 miles west of Route 19 in Shannon County to Route J in Carter County

Project Detail: This project will construct additional lanes of Route 60 and includes grading, paving, culverts and bridges.

Project Length: 15.04 miles

Estimated Completion: October 2009

Roadway Maintenance

Route C and F: MoDOT crews will perform a chip seal to seal out moisture and restore the roadway surface.


Return to top

Crawford County

Construction Project

Route 8: Resurfacing and construction of shoulders.

Location: Roadway east of Route 19 in two disconnected sections

Project Detail: Shoulder construction will begin on the Steelville, Mo., end in the eastbound direction. One lane traffic with flaggers, reduced speed limit to 35 mph. Work hours Monday-Saturday 7am to 7pm

Project Length: 33.22 miles

Estimated Completion: July 2008

Roadway Maintenance

Route 19: MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or other material in ruts along the edge of the roadway.
Route Interstate 44: MoDOT crews will mow the right-of-way. This function controls roadside vegetation and improves sight distance.
Route VV: MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.

Return to top

Dent County

Roadway Maintenance

Route 32: MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry
and maintains stablility and proper drainage of water from the travel lanes.
Route 32: MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and
high spots on the shoulders.
Various Routes: MoDOT crews will replace, install and or maintain roadway signs.
Route VV: MoDOT crews will perform patching on the roadway. This function restores rideablility of the roadway surface.

Return to top

Howell County

Construction Project

Route 142: Contractor will be grading, paving and replacing two low water crossings with box culverts.

Location: Two disconnected sections, located 1.8 miles and 3.2 miles west of Route 17

Roadway Maintenance

Route 17 and Route 160: MoDOT crews will perform shoulder repairs. This function removes ruts, low areas and high spots on the shoulders.
Route AM and town routes: MoDOT crews will work on driveways and approaches and will perform shoulder repairs.
Various Routes: MoDOT crews will replace, install and or maintain roadway signs.

Return to top

Iron County

Construction Project

Route 221 

Location: Between Route 21 Iron County and Route 67 in St. Francois County in Farmington, Mo.

Project Detail: Construct shoulders and resurface, including constructing left turn lane sections in three locations, at the intersection of Routes 221 and Route N, through the community of Doe Run, Mo., and from the St. Francois River Bridge to Route 67 in St. Francois County through the community of Delassus, Mo. Will also add centerline and edgeline rumble strips.

Project Length: 16.25 miles

Estimated Completion: December 2008

Construction Project

Route N: The bridge over the union Pacific rail is open to taffic and shoulder work is still being done.

Location: Route 21 to 0.1 miles north of Radford Road

Project Detail: Improvements include widening the bridge over the Union Pacific Railroad, resurfacing and shoulders.

Project Length: 1.8 miles

Roadway Maintenance

Route 49: MoDOT crews will be working on bridge deck.

Route C: MoDOT crews will blade patch the roadway to restore shape and stability.

Return to top

Oregon County

Roadway Maintenance

Route 160: MoDOT crews will wash bridges to remove dirt and debris.
Route 63: MoDOT crews will patch potholes to restore shape and roadway stability.
Route Y: MoDOT crews will be working to remove debri and repair roads due to flooding
Location: Crews will be patching on Brock Bridge
Various Routes: MoDOT crews will make repairs to driveways and entrances, repairing edge ruts and mowing the right-of-way.


Return to top

Phelps County

Construction Project

Route 63

Location: 1.3 miles north of Route W

Project Detail: The project will include a wider bridge deck and improvements to the roadway joining the bridge.

Project Length: 0.25 miles

Estimated Completion: September 2008

Construction Project

Route 63:Contractor crews will continue to  resurface existing pavement.Traffic will be restricted to one lane  with flaggers in the workzone area as contractor crews lay asphalt. Minimal delays can be expected. Speed will be reduced to 45 mph. Work hours are 7am to 7:00pm Monday - Saturday

Location: North of Edgar Springs,  MO., going south to County Road 6280

Project Detail: Project will include resurfacing and adding passing lanes.

Project Length: 9.4 miles

Location: South of Route CC (Rolla, Mo.) to 3.6 miles south of little pine River near Edgar Springs, Mo.

Project Detail: Resurfacing including shoulders with passing and climbing lanes and bridge rehabilitation.

Project Length: 13.1 miles

Roadway Maintenance

Route 63: MoDOT crews will perform concrete replacement on the roadway.
MoDOT crews will replace drainage pipes near the roadway.
Location: 3 miles south of Rolla
Project Detail: Extension of existing culvert.
Route Interstate 44: MoDOT crews will perform milling on the roadway. Milling removes excess material from cracks and joints.
Various Routes: MoDOT crews will patch potholes to restore shape and roadway stability.

Return to top

Pulaski County

Roadway Maintenance

Route Y: MoDOT crews will replace drainage pipes near the roadway.
Routes 133, and T: MoDOT crews will pave over the roadway surface to restore smooth ride.
Various Routes: MoDOT crews will perform vegetaion control on the right-of-way.

Return to top

Reynolds County

Construction Project

Route 34: Contractor crews will begin work on culvert entensions. Traffic control devices and flaggers will be present when work will be effecting traffic.

Location: Roadway between Route 21 to County Road 582

Project Detail: This project will  build asphalt shoulders, install centerline and edgeline rumblestrips.

Project Length: 10.24 miles

Roadway Maintenance

Route 106: MoDOT crews will perform a chip seal to seal out moisture and restore the roadway
surface.

Return to top

 

Ripley County

Roadway Maintenance

Route 142: MoDOT crews will blade patch the roadway to restore shape and stability.
Route P: MoDOT crews will blade patch the roadway to restore shape and stability.
Routes 160, and 106: MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry and maintains stablility and proper drainage of water from the travel lanes.

Return to top

Shannon County

Construction Project

Route 60: Contractor crews have begun constructing drain structures and clearing in preparation for grading and paving.  Work continues as the contractor constructs culverts in various locations throughout the project.

Location:  0.3 miles west of Route 19 in Shannon County to Route J in Carter County.

Project Detail:  This project will construct additional lanes of Route 60 and includes grading, paving, culverts and bridges.

Project Length:  15.04 miles

Estimated Completion:  October 2009

Roadway Maintenance

Route 99: MoDOT crews will repair edge ruts. This function eliminates shoulder drop-off by placing rock or other material in ruts along the edge of the roadway.
Various Routes: MoDOT crews will work on driveways and approaches.MoDOT crews will work on
driveways and approaches and replace, install and or maintain roadway signs.

Return to top

St. Francois
Construction Project

Route 221:Crews will be adding edgeline and centerline rumble stripes and three separate three-lane sections. There will be lane closures for culvert installations and grading through the project minor delays can be expected.

Location: Roadway between Route 21 Iron County and Route 67 in St. Francois County in Farmington, Mo.

Project Detail: Construct shoulders and resurface, including constructing left turn lane sections in three locations, at the intersection of Routes 221 and Route N, through the community of Doe Run, Mo.,and from the St. Francois River Bridge to Route 67 in St. Francois County through the community of Delassus, Mo. Will also add centerline and edgeline rumble strips.

Project Length: 16.25 miles

 

Texas County

Roadway Maintenance

Route 60: MoDOT crews will perform concrete replacement on the roadway.
Location: West bound, start at Beeler Creek Bridge
Route 137: MoDOT crews will pave over the roadway surface to restore smooth ride.
Route 17: Crews will build a turning lane
Route 32: MoDOT crews will perform work to improve drainage. Drain work keeps the roadway dry
and maintains stablility and proper drainage of water from the travel lanes


Return to top

 

Washington County

Roadway Maintenance

Route P: MoDOT crews will perform patching on the roadway. This function restores rideablility of
the roadway surface.
Various Routes: MoDOT crews will wash bridges to remove dirt and debris.

Return to top

 

 

 

Work Zone Map

Check Your Route
for
Work Zones

Road Conditions

Weather-Related
Road Conditions
Map

Report a Road Concern

Potholes
Mowing
Traffic Signals & Signs

MoDOT Job Opportunities

Job Listings
and
Applications

Welcome to MoDOT
Welcome to MoDOT
Click Another District to
Visit Their Site
Arrive Alive
Planning for Progress
Realty For Sale
Red colored links point to a PDF. Click here for more information.
   
   
CONTACT CONTACT CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District