Project Update:
This project was awarded by the Missouri Highways and Transportation Commission in August.
This project was let in July 2007.
This project is included in the 2008-2012 Statewide Transportation Improvement Plan (STIP). The STIP was approved by the Missouri Highways and Transportation Commission (MHTC) during the July meeting.
|
|
Project Information:
Location: Route 19 to 3.5 miles east of Route J in Carter County
Length: 15.4 miles
Description: Project includes grading, paving, and bridges for a dual divided highway
Contractor: Chester Bross Const. Co./CB Equip. Inc.,
Hannibal Mo.
Project Cost: $36,379,847.99
Construction Began: September 2007
Construction Complete: October 2009
|