Work scheduled:
Rock and dirt grading for new U.S. 65 northbound lanes between Route 165 and Mall Road (some work at night).
Installing storm drain system and pouring concrete for curb and gutter along Route V near College of the Ozarks.
Rock blasting at various locations.
Construction of new Business 65 overpass.
Box culvert installation across Industrial Boulevard.
Highway lighting and traffic signal wiring installed near U.S. 65 and Business 65.
Impact on Traffic:
Traffic stopped occasionally for short periods on Mall and Birch Roads to allow dump trucks to cross the road.
Watch for equipment close to traffic on Route V near College of the Ozarks.
Traffic stopped for short periods during blasting operations.
One-lane traffic on Industrial Boulevard.
All other work planned should take place AWAY from traffic.
Work zone speed limit on U.S. 65: 45 mph.
Project background: Construction of U.S. 65/Business 65 interchange and overpass for Business 65 north of new interchange and widening of U.S. 65 to four lanes along 1.6 miles (2,000 feet north of Bus. 65/Route V to just south of Route 165.)
Cost: $19.2 million (low bid), shared by MoDOT, City of Hollister and Taney County.
Prime contractor: W.A. Ellis Construction of Independence.
Scheduled completion: Fall 2006.