Route 185 / Elmont Road Overpass Project

What Is The Problem With Route 185 In The City Of Sullivan?

Route 185 north of Interstate 44, west Springfield Road south of Interstate 44 and the Interstate 44 interchange east of Route 185 are all very congested. This project will help relieve current congestion and accommodate future traffic growth in the city of Sullivan.

What Improvements Are Being Proposed?

  • Relocate Route 185 slightly to the east and construct a new Route 185 bridge over Interstate 44 that would connect to Elmont Road. The new bridge would have two 12-foot lanes and two 6-foot shoulders. This would provide significant traffic relief to the Interstate 44 interchange (Exit 225) to the east. Sidewalks will be included on both sides of the new bridge and the shoulders and the approaches will be striped for bicycle lanes.
  • Improve Alice Road to provide a connection to Route 185 and extend the roadway to the east to tie into Route WW (north outer road).
  • Improve west Springfield Road, Route D and North Park Street to provide new connections to the south outer road.
  • The cul-de-sac at the south outer road has been eliminated and the south outer road will remain open. This is different than what was shown at the March 2005 public hearing. At the public hearing, the south outer road was to become a cul-de-sac near the Exit 225 intersection. In the current design, driving south on the south outer road, the western turning movement onto Exit 225 will remain open, but the eastern turning movement will be eliminated.

  • Add a traffic signal at the west Springfield (Exit 225) intersection (re-designated as Route 185).
The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

How Will Traffic Be Impacted While Construction Is Under Way?

Temporary lane closures and detours can be expected on Interstate 44, Springfield Road and Elmont Road.

What Is The Estimated Construction Cost?

The city of Sullivan and MoDOT will share the total cost of the project (50/50). By sharing the cost of the project, improvements can be made much sooner than originally scheduled. The project was awarded to Don Schneiders Excavating for approximately $8.5 million.

When Will Construction Begin And End?

Construction is underway and is expected to be completed by late 2008.

Current Project Timeline:

September 2006
Final design was completed.

March 2007
This project is was awarded to Don Schneiders Excavating.

Summer 2007
Construction began.

Fall 2008
Construction complete.

Who Do I Contact For More Information?

Contact MoDOT Project Manager Shirley Norris at 1-888 ASK MODOT (275-6636) or e-mail Shirley.Norris@modot.mo.gov

Contact MoDOT Area Engineer Judy Wagner at 1-888 ASK MODOT (275-6636) or e-mail Judy.Wagner@modot.mo.gov

Contact MoDOT Community Relations Specialist Kara Price

at 1-888 ASK MODOT (275-6636) or email Kara.Price@modot.mo.gov

   
   