WHAT'S HAPPENING IN 2008 and 2009?
North Jefferson/South St. Louis County Projects 2007-2009 (1.39 Mb, 1 page)
CURRENT/FUTURE PROJECTS:
- Route 30 and Little Brennan (Jefferson County) – Intersection improvements to relieve congestion. This project includes dual left turn lanes on eastbound and westbound Highway 30 and a southbound right turn lane . Construction is expected to begin in April 2008.
- Route 61/67 at Richardson (Jefferson County) – Intersection improvements. These improvements include a northbound dual left turn lane and an eastbound dual right turn. Construction should begin in April 2008.
- Route 30 from MO 141 to Route B (St. Louis County) - Signal interconnection along Highway 30 from Route 141 to Route B. Construction began in November 2007.
- MO 30, MO 231, MO 267 and MO 366 (St. Louis County) - Interconnect signals along MO 231, MO 267, MO 366. Construction began in November 2007.
- MO 30 and MO 21 (St. Louis County) - Interconnect signals along Highway 30 from Rahning to River Des Peres and along Highway 21 from Lindbergh to Route 30. Construction to begin in November 2007.
- Route 30 over Gravois Creek (St. Louis County) - Replacement of the bridge over Gravois Creek in front of Grant's Farm. The new bridge will have shoulders, a left turn lane for Grant Road and a new signal. The bridge will require a two month road closure. Anticipated notice to proceed in fall 2008.
- MO 21 from Meramec River to Route 141 from Route 30 to the Jefferson County line (St. Louis County)- Asphalt surfacing. Construction to begin spring 2008.
- I-44 from I-270 to Williams Creek (St. Louis County) - Pavement repair. Construction to begin June 2008.
- I-55 from 4500 South Broadway to Lindbergh (St. Louis County) - Replacement of three bridges and four bridge rehabs. TBD.
- Route 30 at Geyer/Sappington Barracks (St. Louis County)- Install signal at Route 30 and Geyer Road to provide a safer access and reduce accidents at this intersection. Construction scheduled to begin in spring 2008.
- Highway 141 landslide (St. Louis County)- Addresses a landslide issue. Construction currently underway.
- I-55 at Reavis Barracks Road (St. Louis County) - Interchange improvements widening the north ramp providing a left, left/right and right turn lane. Anticipated notice to proceed in May 2008.
- I-55 bridge over Meramec (St. Louis County) - Bridge painting. Anticipated notice to proceed November 2008.
- I-55 West Outer Road over Rock Creek (Jefferson County)- Bridge replacement over Rock Creek near Seckman Road on the I-55 West Outer Road. The bridge will have a two month closure this summer. Anticipated notice to proceed May 2008.
- Route 21 bridge over Meramec River (Jefferson County) - Asphalt bridge deck. Anticipated notice to proceed May 2009.
- Route 30 bridge over Saline Creek (Jefferson County) - Repair eastbound and westbound bridge and resurfacing. Anticipated notice to proceed May 2009.
- Route 30 bridge over Heads Creek (Jefferson County)- Rehab westbound lanes of bridge. Anticipated notice to proceed November 2009.
This information is provided in Acrobat Reader format. Free Acrobat Reader download
2008 and 2009 Construction in South St. Louis and North Jefferson County (382 Kb, 1 page)
Projects completed in previous years:
For more information, contact:
Contact MoDOT Project Manager Shirley Norris at 1-888 ASK MODOT (275-6636) or click here to e-mail.
Contact MoDOT Area Engineer Kristy Yates at 1-888 ASK MODOT (275-6636) or click here to e-mail.
Contact MoDOT Community Relations Specialist Jack Wang at 1-888 ASK MODOT (275-6636) or click here to e-mail.
|